Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 105 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />'* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time. <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.36 <br />0.36 <br />0.36 <br />0.36 <br />0.00 <br />NA <br />0.00 <br />NA <br />0.73 <br />0.73 <br />Total job time <br />Page 2 of 2 <br />LAMAR <br />20.00 miles <br />55.00 mph <br />$3,609.95 <br />$0.00 <br />1.45 Hours <br />Total job cost: $3,609.95 <br />CIRCES Cost Estimating Software <br />