Laserfiche WebLink
Table 2.05.4(2)(a) -1 <br />Reclamation Time Table <br />Activity <br />Year <br />Contemporaneous Reclamation of Mined Area <br />Backfill Replacement <br />Topsoil Replacement <br />Revegetation <br />2013 -2018 <br />2013 -2018 <br />2014 -2018 <br />Relocation of CC Ditch <br />2016 <br />Facilities <br />2019 <br />Haul Roads <br />2020 <br />Phase 1 Bond Release <br />2016 -2018 <br />Phase 2 Bond Release <br />2021 -2023 <br />Phase 3 Bond Release <br />2028 <br />Sediment Ponds <br />2029 <br />1 The light use road connecting the mining area to Pond NH1 -001 will not be reclaimed, as it was present in the pre <br />mine condition. <br />Section 2.05.4 Page 3 July 2013 (TR 03) <br />_qo- Avj- 2-oj� <br />