My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-17_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2013-09-17_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:08 PM
Creation date
9/24/2013 7:46:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
9/17/2013
Doc Name
September 17, 2013 J.E. Stover & Associates Site Visit Report
From
Tamme Bishop
To
DRMS
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes for site visit September 17, 2013: <br />1 arrived on site and met with Bill Bear and Dan Quigley with <br />Buckhorn Geotech. The purpose of this site visit was for Dan's third <br />quarter inspection and site assessment. Since DRMS was on site last <br />week, there is not a lot to report that likely wasn't observed last <br />week. <br />Significant progress has been made in the gob pile #2 area since my <br />last visit. The north east portion of the pile is the only area left to be <br />completed before NOV 2013 -004 can be completely abated. A hole <br />had been dug down to the level of gob that existed before gob started <br />accumulating over the winter months. Compaction testing in the <br />depression, or hole has been performed. This area will be brought to <br />grade with lifts of gob that have been in stockpile since the winter <br />months. <br />We walked around both gob piles #2 and #4. There was nothing of <br />concern on either pile. <br />In addition to the top of the pile, the Operator is also working the <br />bench #3/4 area. <br />Gob was being hauled only to gob pile #3 while I was there. It is being <br />blended with coverfill in an effort to dry it before placement and <br />compaction. <br />Ponds F, C & D still have some water. They are being allowed to dry <br />further before cleaning them out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.