Laserfiche WebLink
COST SUMMARY <br />Task description: Remove 2 power poles in trash bin /water tank area, MR -380 <br />Site: West Elk Mine Permit Action: MR -380 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 80B State: Colorado <br />Date: 9/30/2011 County: Gunnison <br />User: TAK <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C007 -80b <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />80a <br />Remove 2 power poles, trash bin/water tank area, <br />DEMOLISH <br />1 <br />0.26 <br />$474.39 <br />Profit: <br />MR -380 <br />Total = <br />$47.44 <br />SUBTOTALS: <br />0.26 <br />$ $474.39 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />0.00 <br />Total = <br />$0.00 <br />Performance bond: <br />0.00 <br />Total = <br />$0.00 <br />Job superintendent: <br />0.00 <br />Total = <br />$0.00 <br />Profit: <br />10.00 <br />Total = <br />$47.44 <br />TOTAL O & P = <br />$47.44 <br />CONTRACT AMOUNT (direct + O & P) = <br />$521.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contractibid preparation: <br />4.25 <br />Total = $22.18 <br />Reclamation management and/or administration: <br />3.25 <br />$16.96 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $86.58 <br />TOTAL BOND AMOUNT (direct + indirect) = $560.97 <br />