Laserfiche WebLink
• <br />LIST OF TABLES <br />Table No <br />1.2 -1 <br />Permits and Licenses for Surface Mining and Reclamation Operations at <br />Trapper Mine <br />1.2 -2 <br />Permits and Licenses for Surface Mining and Reclamation Operations for <br />Affiliate Coal Operations, held by the principal shareholders of Trapper <br />Mining Inc. <br />1.4 -1 <br />Summary of costs for Trapper Mine Bond Determination <br />1.4 -2 <br />Summary of Regrade Costs <br />1.4 -3 <br />Calculations for Time Required to Regrade Pits <br />1.4 -4 <br />Calculations for Drill and Blast Costs <br />1.4 -5 <br />Calculations for Time Required to Regrade Roads <br />1.4 -6 <br />Calculations for Time Required to Regrade Impoundments <br />1.4 -7 <br />Calculations for Time Required to Regrade Diversions <br />• <br />1.4 <br />Summary Topsoil Replacement <br />-8 <br />of Costs <br />1.4 -9 <br />Calculations for Time Required for Retopsoiling <br />1.4-10 <br />Summary of Revegetation Quantities and Cost Calculations <br />1.4 -11 <br />Production, Material and Total Revegetation Costs by Revegetation <br />Treatment with a Total Revegetation Cost for each of the Three <br />Land Use Types <br />1.4 -12 <br />Revegetation Treatment Sequencing and Associated Production Costs <br />per Acre Excluding Topsoiling <br />1.4 -13 <br />Equipment and Operator Cost Estimates for Revegetation Work <br />1.4 -14 <br />Current Local Revegetation Material Cost <br />1.4 -15 <br />Change in Disturbance to Determine Worst Case Year for Bond <br />1.4 -16 <br />Miscellaneous Costs <br />• 10/10 <br />iii -1 <br />Page <br />1 -9 <br />1 -11 <br />1 -32 <br />1 -34 <br />1 -35 <br />1 -35f <br />1 -36 <br />1 -37 <br />1 -38 <br />1 -42 <br />1 -43 <br />1 -54 <br />1 -55 <br />1 -56 <br />1 -57 <br />1 -58 <br />1 -59 <br />1 -59a <br />