Laserfiche WebLink
List of Figures - continued <br />• <br />Figure No. <br />Pane(s <br />2.7 -290 <br />Water -level elevation versus time for Well P -1 <br />2 -523p <br />2.7 -29p <br />Water -level elevation versus time for Well GC -3 <br />2 -523q <br />2.7 -29q <br />Water -level elevation versus time for Well Coy <br />2 -523r <br />2.7 -30 <br />Recovery of Flume Well No. 1 <br />2-549 <br />2.7 -31 <br />Recovery of Pyeatt Well No. 1 <br />2 -552 <br />2.7 -32 <br />Drawdown in observation Pyeatt Well 2 from pumping <br />2 -554 <br />Pyeatt Well 3 <br />2.7 -33 <br />Recovery of Pyeatt Well 3 <br />2 -557 <br />2.7 -34 <br />Drawdown and Recovery of Pyeatt Well 4 <br />2 -560 <br />2.7 -35 <br />Recovery of Pyeatt Well 5 <br />2-5 <br />2.7 -36 <br />Recovery of Pyeatt Well 6 <br />2-5 <br />2.7 -37 <br />Recovery of Pyeatt Well 8 <br />2-568 <br />2.7-38 <br />Flume Alluvium Cross Section at the Coy Site <br />2 -5761 <br />2.7 -39 <br />Flume Alluvium Cross Section at the GC -3 Site <br />2 -576j <br />2.7-40 <br />Flume Alluvium Cross Section at the GT1 site <br />2 -576k <br />2.741 <br />Water -Level Elevation in Coy Alluvial Well, FT -MSL <br />2 -5761 <br />2.7-42 <br />Water -Level Elevation in GC3 Alluvial Well, FT -MSL <br />2 -576m <br />• <br />2.7-43 <br />Depth to Water Versus Time for Coy B and GC3A <br />2 -576n <br />2.7-44 <br />Stream Cross - Sections of the GT and GC Flume Drainages <br />2 -576o <br />2.7-45 <br />Stream Profiles of the GT and GC Flume Drainages <br />2 -576p <br />2.7-46 <br />GC Flume (S1 Site) Daily Mean Flows, May 1985 - October 1986 <br />2 -576q <br />3.1 -1 <br />Mine and permit identification signs <br />3 -3 <br />3.1 -2 <br />Blasting signs <br />3-5 <br />3.1 -3 <br />Topsoil stockpile markers <br />3-6 <br />3.1-4 <br />Perimeter markers <br />3-7 <br />3.3 -1 <br />Drill hole abandonment for drill holes not completed <br />3-26 <br />in an aquifer <br />3.3- 1A,B,C <br />Drill hole abandonment for drill holes completed through <br />3- 26a,b,c <br />an aquifer or through multiple aquifers <br />3.4 -1 <br />Public notice of blasting operations <br />3-29 <br />3.4 -2 <br />Typical delay scheme (99 -hole pattern) <br />3 -33 <br />3.4 -3 <br />Explosives load sheet <br />3 -34 <br />3.4-4 <br />Typical delay scheme (64 -hole pattern) <br />3 -35 <br />3.5-1 <br />Conceptualization of multiple coal seam stripping <br />3-41 <br />3.5 -2 <br />Conceptual pit closure and elimination of the final highwall <br />3-47 <br />• <br />F?r_ulgip'r /h/L <br />ii-8 <br />APPROVED t l 0 2005 <br />