Laserfiche WebLink
Page llof18 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />3200.00 <br />2.00 <br />3.00 <br />5.00 <br />1550 <br />2.334 <br />Haul Time: 2.334 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />3200.00 <br />-2.00 <br />3.00 <br />1.00 <br />3503 <br />1.154 <br />Return Time <br />Total Truck Cycle Time <br />1.154 <br />6.968 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,506.12 LCY/Hour Adjusted for job efficiency: 1,250.08 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 5,000.30 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.016 /LCY <br />Total job time: 24.12 Hours <br />Total job cost: $93,674.58 <br />CIRCES Cost Estimating Software <br />