Laserfiche WebLink
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Machine <br />Total <br />; Fleet Size Haul Trip I <br />Return Trip <br />Description_ <br />Cost/hour/unit <br />(No units) CosUhr /fleet <br />CosUhr/fleet <br />SuDmersibie punk - 460v. 8 <br />in <br />$3049 <br />1 i $3049 <br />$3049 <br />- Gerlwâ–ºator, diesel - 15 KW <br />$1288 <br />t $1288 <br />$1288 <br />-Water Tanker, 3.500 Gal <br />S5834 <br />1 $5834 ; <br />r <br />i <br />S5834 <br />I <br />Subtotals ' S101 71 I <br />Sf 01.71 <br />EQUIPMENT MAUL DISTANCE <br />and TIME <br />Nearest major city or town within project area region <br />l ongimont <br />Tlans 2ga_IirT Gycte Time_ <br />Non <br />Total one -way travel distance <br />120 <br />miles <br />Roadable <br />Roadabte <br />Average travel speed <br />400 <br />mph <br />Equipment <br />Equipment <br />Haul time (hours) = <br />030 <br />030 <br />Total non - roadabie mob/demob cost ' <br />$15,39866 <br />Return time (hours) = <br />030 <br />030 <br />two round aims +wtt+ naut nq <br />Loading time (hours) = <br />300 <br />NA <br />Total roadabie mob/demob cost "' <br />$6102 <br />Unloading time (hours) = <br />300 <br />NA <br />" one round tnv no haul Fw <br />Subtotals = <br />660 <br />060 <br />JOB TIME AND COST <br />Total lob time <br />13.20 <br />hours <br />Total job cost <br />$15460 <br />