Laserfiche WebLink
Exhibit E — Reclamation Plan <br />plant(s), concrete batch plant, asphalt batch plants, recycling facilities and related <br />operations, shop, scale- house /office, and supporting facilities (fuel depots, parking <br />areas, oil and gas facilities access, etc.) for continued industrial - commercial use (as <br />validated by any co- related and required Weld County Building Permits); the creation of <br />unforeseen future structures, and for the use and development of on -site water <br />resources. Since the area of surrounding lands is a mix of these uses, the site end use <br />will retain these potentials. <br />The rate of reclamation activity, including grading, soiling and revegetation will follow <br />concurrently with extraction and the respective timetables identified for extraction <br />under Exhibit D — Extraction Plan. All timetables are contingent upon market <br />conditions, therefore, a probable range of time is indicated. With extraction activities <br />anticipated to take up to 25 years to complete, reclamation will add an approximately <br />five years to this estimate, bringing the anticipated life of the mine to 30± years, or the <br />year 2043 -44. <br />A Backfill Notice follows this page, as part of this Exhibit. The use of inert fill will <br />facilitate the timely fill of selected portions of the project area as desired, and related <br />reclamation of affected lands and use of related water resources (refer to Exhibit L — <br />Reclamation Costs). <br />Varra Companies, Inc. Varra- Coulson Resource Project 4 <br />OMLR 112 Permit Application 8 August 2013 <br />