Laserfiche WebLink
Page 7 of 11 <br />BULLDOZER WORK <br />Task description: Replace Topsoil to Drill Pad <br />Site: Deserado Mine Permit Action: TR69 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 9/18/2013 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />Abbreviation: None <br />Filename: C018 -004 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL OUANTITIES <br />Initial Volume: 970 <br />Swell factor: 1.000 <br />Loose volume: 970 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL OUANTITIES <br />Initial Volume: 970 <br />Swell factor: 1.000 <br />Loose volume: 970 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />CIRCES Cost Estimating Software <br />