Laserfiche WebLink
Average push distance: 65 feet <br />Unadjusted hourly production: 1,752.8 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />5,800 feet <br />2,900 lbs/LCY <br />Weight description: Dec( <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />rock - 50% Rock, 50% Earth <br />Source <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: 778.77 LCY/hr <br />Adjusted fleet production: 778.77 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.343/LCY <br />Total job time: 2.17 Hours <br />Total job cost: 5580.17 <br />