My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-19_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2013-09-19_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:16 PM
Creation date
9/19/2013 12:40:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/19/2013
Doc Name
Adequacy Letter
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
TR69
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim RS -11L and Associated Road <br />Site: Deserado Mine <br />PROJECT IDENTIFICATION <br />Permit Action: TR69 <br />Task #: 000 State: Colorado <br />Date: 9/17/2013 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1981018 <br />Abbreviation: None <br />Filename: C018 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Plug and Seal RS -11L <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.00 <br />$468.47 <br />$580.17 <br />$123.95 <br />$273.16 <br />$435.39 <br />Regrade Drill Pad <br />DOZER <br />2.17 <br />Regrade Light -Use Road <br />DOZER <br />0.50 <br />Replace Topsoil to Drill Pad <br />DOZER <br />1.10 <br />Reseed Drill Pad and Associated Road <br />REVEGE <br />1.52 <br />SUBTOTALS: <br />5.29 <br />$1,881.14 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: 2.02% <br />Total = <br />$38.00 <br />Performance bond: 1.05% <br />Total = <br />$19.75 <br />Job superintendent: 2.64 hrs <br />Total = <br />$172.68 <br />Profit: 10.00% <br />Total = <br />$188.11 <br />TOTAL O & P = <br />$418.54 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$2,299.68 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25% <br />Total = <br />$97.74 <br />Reclamation management and /or administration: <br />5.00% <br />$114.98 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$631.26 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,512.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.