My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-16_REVISION - M1983028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983028
>
2013-09-16_REVISION - M1983028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:15 PM
Creation date
9/19/2013 9:24:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983028
IBM Index Class Name
REVISION
Doc Date
9/16/2013
Doc Name
Conversion Application
From
Stone Sand & Gravel
To
DRMS
Type & Sequence
CN1
Email Name
GRM
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />'_00 <br />0 <br />7200 <br />0 72C <br />2.0 inches <br />Permanent Road (to be <br />realigned along permit <br />boundary and extended <br />to west (final grade to <br />match between this and <br />llW��d M1990 -025 to north) <br />TI Permanent Road and <br />o ridge to be left along <br />Scattered ediment basins along top and property boundary unless <br />sides of esa \\ exact location may vary) agreed to daylight by <br />��d <br />It U DAKYtacent owner <br />Six each Permanent <br />Sediment Basins (No <br />permanent water surface) <br />7 <br />00 <br />Permanent Road <br />(May have alignment <br />changed slightly) <br />GENERAL LEGEND: Showing proposed post- mining and post - reclamation Stone Sand &Gravel IM' U e N h FEET: Scale 1" =660' on 8.5x11 paper contours, 20 -foot interval, based on average excavation depth of 20 -25 feet, <br />Drawn by: NAB Checked by: KJS and assuming deposit conforms to known outcrop dip and strike and extends Wallace Pit M1983-028 <br />to elevation 7300. Basins shown in blue are for detention of water and Post - Reclamation Contour <br />sediment, and NOT for retention of water to be permanent open water. Roads <br />shown may be realigned as they are rebuilt. Final landowner approval of road F -2B West <br />Nathan A. Barton, CE, PE, DEE, DATE: 15 AUG 2013 alignment required.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.