Laserfiche WebLink
M K J <br />1 &VONROS -LINd2c" <br />I H <br />G <br />F <br />, <br />I <br />I <br />Q <br />0 <br />5 <br />DIRECT O O RECL MA ION YE <br />4 <br />3 j ENMIT BOUNDARY <br />Temporary Cross -Fence — <br />Road to be reclaimed <br />2 about Year 35 <br />1 <br />1320 feet ---� <br />2.0 inches <br />>1to8 <br />Al JVaNnoe ilWbEd <br />C B A <br />– Special Area around WAPA <br />Pylon to be reclaimed <br />Existing M1990 -025 <br />12 affected area <br />0 <br />DIRECTION OF RECLAMATION <br />W <br />YEARS 36 o 49 1 <br />0 <br />C <br />z <br />0 <br />D <br />MIT BOUN <br />Existing M1983 -028 <br />110 affected area <br />5 <br />n <br />< 3 <br />Q <br />0 <br />z <br />0 2 <br />m <br />o' <br />w <br />o_ <br />1 <br />7,500 <br />GENERAL LEGEND: Showing areas to be reclaimed, in general sequence, Stone Sand &Gravel <br />t) FEET: Scale 1" =660' on 8.5x11 paper matching mining progress by blocks except as indicated. Areas on the exterior <br />Drawn by: NAB Checked by: KJS of the permit area will be reclaimed to final slope (max 2:1) ; interior Wallace Pit M 1983 -028 <br />boundaries between mining blocks will have "highwalls" of 2:1 (max) until Reclamation Areas <br />mining is completed on both sides of boundaries. Reclamation work will be <br />done so that (except for revegetation), affected and unreclaimed lands will be F -1 A East <br />Nathan A. Barton, CE, PE, DEE, DATE: 15 AUG 2013 limited to 5 acres (except as noted), following 400 -500 feet behind face. <br />