Laserfiche WebLink
f <br />4 <br />U \�T S R Q P O N M 1. K J <br />New Permanent <br />Road <br />5 <br />r r <br />3 <br />3 <br />2 <br />2 LJ f <br />1 1 <br />Existing <br />Permanent <br />Roads to <br />be rebuilt <br />1320 e <br />�- 2.0 inches <br />Existing, Permanent <br />Road <br />This map shows proposed mining: blocks are identified by grid A -U and 1 -5. Stone Sand & Gravel <br />h FEET: scale 1" =660 on 8.5x11 paper Each block (average 5 acres in size) is estimated to be one year of mining, in <br />Drawn by: NAB Checked by: KJS which approximately %3 is stripped and being mined, %3 is working face area, and Wallace Pit M1983-028 <br />/4 is plant and stockpile area. General sequence years 1 to 48 shown is subject Mining Map <br />to change based on depth of deposit, overburden, sales, and other factors. The <br />location of product stockpiles and plant will move with the specific block being C -2 B West <br />Nathan A. Barton, CE. PE, DEE, DATE: 15 AUG 2013 mined. Permanent and some temporary roads will be extended with mining. <br />