My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-18_REPORT - P2009025
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2009025
>
2013-09-18_REPORT - P2009025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:08:30 AM
Creation date
9/19/2013 9:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009025
IBM Index Class Name
REPORT
Doc Date
9/18/2013
Doc Name
Annual Fee/Report/Map
From
Black Range Minerals
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining 1 nd Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />15. Are all hazardous materials stored within approved spill containment structures? YE NO N/A <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring tion <br />annually? YES N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: L� <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />9,0 Y1� tc Lf <br />A(kW <br />ins �u 0 OA O�,�I�e� to 2a ►► . <br />s�t,� lid -� 5e�- be ►� <br />Z3. 2013- k eS- W4 oL W <br />g <br />D,ZS - e;Lcrf Sc�,y- Fa o ti41, AAiA c-e- <br />)v 4-o <br />JF %kAvv\A4-o r, ko leJ <br />sf- <br />
The URL can be used to link to this page
Your browser does not support the video tag.