Laserfiche WebLink
Page 4 of 4 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />( %) <br />(fpm) <br />Time <br />644.20 LCY/Hour <br />Optimal No. of Trucks: <br />6 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />9000.00 <br />2.50 <br />3.00 <br />5.50 <br />1266 <br />7.251 <br />Haul Time: 7.251 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 2 <br />Team(s) <br />Unit cost: $1.329 /LCY <br />Total job time: 2,207.24 Hours <br />Total job cost: $22,416,856.40 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />4,603.46 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />Truck Unit Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />644.20 LCY/Hour <br />Optimal No. of Trucks: <br />6 Truck(s) Selected Number of Trucks: <br />8 Truck(s) <br />Adjusted hourly truck team production: 5,153.63 <br />LCY/Hour <br />min <br />LCY/Hour <br />1 <br />9000.00 <br />-2.50 <br />3.00 <br />0.50 <br />3503 <br />2.790 <br />JOB TIME AND COST <br />Fleet size: 2 <br />Team(s) <br />Unit cost: $1.329 /LCY <br />Total job time: 2,207.24 Hours <br />Total job cost: $22,416,856.40 <br />CIRCES Cost Estimating Software <br />Return Time: 2.790 <br />minutes <br />Total Truck Cycle Time: 13.521 <br />minutes <br />Loading Tool unit <br />Production <br />4,603.46 LCY/Hour Adjusted for job efficiency: <br />3,820.87 LCY/Hour <br />Truck Unit Production <br />776.15 LCY/Hour Adjusted for job efficiency: <br />644.20 LCY/Hour <br />Optimal No. of Trucks: <br />6 Truck(s) Selected Number of Trucks: <br />8 Truck(s) <br />Adjusted hourly truck team production: 5,153.63 <br />LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 7,641.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 <br />Team(s) <br />Unit cost: $1.329 /LCY <br />Total job time: 2,207.24 Hours <br />Total job cost: $22,416,856.40 <br />CIRCES Cost Estimating Software <br />