My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-09-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:12 PM
Creation date
9/19/2013 8:05:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/18/2013
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
TR99
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load and Haul Spoil from East Taylor Fill to South TayloPit <br />Site: Colowvo Coal Mine Permit Action: Technical Revision 99 Permit/Job #: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 612 State: Colorado <br />Date: 9/18/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: KOMATSU 830E <br />- Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat D1 1R - 11U <br />-Dump Area: Cat D1 1R - 11U <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: C019 -612 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $10,156.08 <br />MATERIAL QUANTITIES <br />Initial volume: 16,867,109 CCY Swell factor: 1.000 <br />Loose volume: 16,867,109 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,572 Pounds/LCY <br />User Provided <br />492,200 Pounds <br />191.37 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$113.41 <br />$344.51 <br />$126.54 <br />$126.54 <br />$63.07 <br />$64.31 <br />Operating cost/hour: <br />$307.64 <br />$531.88 <br />$280.92 <br />$280.92 <br />$45.18 <br />$73.13 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />$37.41 <br />$37.41 <br />$27.55 <br />$21.17 <br />Unit Subtotals: <br />$446.72 <br />$912.20 <br />$444.88 <br />$444.88 <br />$135.79 <br />$158.61 <br />Number of Units: <br />16 <br />2 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $8,971.92 <br />Support: $889.76 <br />Maint: $294.40 <br />Total work team cost/hour: $10,156.08 <br />MATERIAL QUANTITIES <br />Initial volume: 16,867,109 CCY Swell factor: 1.000 <br />Loose volume: 16,867,109 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,572 Pounds/LCY <br />User Provided <br />492,200 Pounds <br />191.37 LCY <br />CIRCES Cost Estimating Software <br />