Laserfiche WebLink
necessary (in areas where the channel will be disturbed) to ensure that the channels will be stable <br />and not contribute suspended solids to streamflow and runoff outside the permit area (Rule <br />4.05.4(2)(a)). <br />4. The sixth page of Appendix 5 -2 includes information on the Permanent Channel Realignment of <br />Carbon Junction Channel to run through the reclaimed pit area. Since the Carbon Junction Diversion <br />will be a permanent structure and Carbon Junction Channel will not be restored to its original <br />configuration, this page should be eliminated or revised to indicate that the design will not be <br />implemented. <br />5. The design information and maps provided with the technical revision application have not been <br />certified by a registered professional engineer. Please provide the required certification for all of <br />the maps, cross - sections, and plans submitted (Rules 2.10.3(2) and 4.05.4(2)). <br />Should you or the operator have any questions or need additional information, please let me know. <br />