Laserfiche WebLink
Climax Molybdenum <br />A Freeport- McMoRan Company <br />COLORADO OPERATIONS <br />Henderson Mine <br />P.O. Box 68 <br />Empire, CO 80438 <br />Phone (303) 569 -3221 <br />y <br />September 16, 2013 <br />Sent Via Email and UPS Tracking #: 1Z 804 847 03 7870 4700 <br />Mr. Peter Hays <br />Colorado Division of Reclamation, Mining and Safety <br />L 1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: 2011 -2012 Annual Report, Red Mountain Exploration Drilling, Permit P- 2011 -014 <br />Dear Mr. Hays: <br />Climax Molybdenum Company (Climax) is submitting its 2011 -2012 Annual Report for Red Mountain <br />Exploration Drilling (Permit No. P- 2011 -014), associated attachments and payment for the required <br />annual fee of $86.00. <br />This annual report was noted in your report for the August 15, 2013 inspection of the Harrison Mountain <br />and Red Mountain prospecting area as not having been submitted, and is therefore being submitted at <br />this time. <br />If you have any questions or need additional information, please do not hesitate to contact me at 303- <br />569 -3221, ext. 1233 or Bryce Romig at ext. 1204. <br />Sincerely, <br />Miguel Hamarat <br />Chief Environmental Engineer <br />Climax Molybdenum Company <br />Henderson Operations <br />Enclosures: <br />• Annual Report Form <br />• Map <br />• Drill Hole Abandonment Report <br />• Check #0000799231 for $86.00 <br />• Continuation Certificate for Bond #022041643 <br />Cc (via email): <br />Bryce Romig, Climax <br />Nyssa Loepke, Climax <br />RECEIVED <br />SEP 17 2013 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />