Laserfiche WebLink
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES N N/A <br />If "NO" please explain: 3 t/6+ ') h 6C J U ve,'J Ale- <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of tl}� <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO N/ <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring i ormation <br />annually? YES NO N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(l)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Finan pal arranty is till in <br />place and 's adequate to lly re laim the approved prospecting site disturbance(s). /��i <br />G�10 e- <br />/1" 011 -f ti � . <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. ,/, f0 <br />