My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-17_ENFORCEMENT - C1992080
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1992080
>
2013-09-17_ENFORCEMENT - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:07 PM
Creation date
9/17/2013 3:00:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
ENFORCEMENT
Doc Date
9/17/2013
Doc Name
Paid Violation (Settlement Agreement)
From
Oakridge Energy, Inc
To
DRMS
Violation No.
CV2013005
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />1011►1�ii <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />RECEIVED <br />SETTLEMENT AGREEMENT SEP 17 2013 <br />NOWCO NO.: CV- 2013 -005 DNISION OF RECLAMATION <br />MINING AND SAFETY <br />Carbon Junction Mine DATE ISSUED: August 30, 2013 <br />PERMIT NO.: C- 1992 -080 <br />OPERATOR/PERMITTEE: Oakridge Energy, Inc. <br />ATTENTION: Arbie Marie Price <br />ADDRESS: 4613 Old Jacksboro Highway <br />TYPE OF MINE: Surface Coal <br />COUNTY: La Plata <br />Wichita Falls, TX 76302 <br />The Division of Reclamation, Mining and Safety ( "the Division ") issued a certain Notice of Proposed Amount of <br />Civil Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34- 33- 123(8). The <br />requested conference having been held as required by law, on August 27, 2013, the Division and the operator <br />hereby agree as follows: <br />1. The amount of the penalty shall be $1,250.00 <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34- 33- 123(8)(a). <br />OPERATOR: .. �, L DATE: <br />uc�By CRkli,.. <br />DIVISION OF RECLAMATION, MINING AND SAFETY: <br />Officer <br />DATE: M4��013 <br />By L (:� Penalty Adjustment Reviewed <br />Division Director [Rule 5.04.3(4)(c)] <br />CRS 34- 33- 123(8)(c) and (d) <br />
The URL can be used to link to this page
Your browser does not support the video tag.