My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-04_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2013-09-04_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:44 PM
Creation date
9/17/2013 7:35:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
9/4/2013
Doc Name
3rd Adequacy Review & Cost Estimate
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
RN6
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Williams Fork Mines <br />Page 48 of 136 <br />MOTOR GRADER WORK <br />Finish Grade Refuse Area <br />Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 027 State: Colorado <br />Date: 9/6/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />Permit/Job #: C1981044 <br />Abbreviation: None <br />Filename: C044 -027 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />24.00 <br />Exhibit 23, page 3 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$41.37 <br />Selected Blade Angle: <br />NA <br />Operating Cost/Hour: <br />$67.74 <br />12.10 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />feet <br />0 <br />Operator Cost/Hour: <br />$27.55 <br />Unadjusted Hourly Unit Production: <br />NA <br />Total Unit Cost/Hour: <br />$136.65 <br />Total Fleet Cost/Hour: <br />$139.95 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />24.00 <br />Exhibit 23, page 3 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish <br />grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5400 feet <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />1.5609 <br />1.5609 <br />Grader(s) Total job time <br />acres/Hour <br />acres/Hour <br />15.38 Hours <br />Unit cost: $87.55 per acre Total job cost: $2,101.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.