Laserfiche WebLink
Page 2 of 136 <br />045 <br />046 <br />047 <br />048 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />072 <br />074 <br />077 <br />078 <br />079 <br />085 <br />090 <br />091 <br />092 <br />093 <br />Regrade Pond 9A -P3 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.76 <br />$197.05 <br />$488.23 <br />$1,808.43 <br />$2,600.29 <br />$27,100.75 <br />$4,173.47 <br />$7,920.08 <br />$5,582.24 <br />$384.44 <br />$16,574.22 <br />$11,484.77 <br />$30,588.07 <br />$628.70 <br />$169.12 <br />$173.60 <br />$415.04 <br />$393,575.83 <br />$33,254.25 <br />$44,561.83 <br />$52,266.50 <br />$1,470.29 <br />$206.74 <br />$5,948.21 <br />$2,732.32 <br />$547.54 <br />$6,146.73 <br />$61.89 <br />$184,740.00 <br />$13,099.36 <br />$2,361.48 <br />$38,105.67 <br />$2,130.32 <br />Regrade Pond 9A -P2 <br />DOZER <br />1.89 <br />Regrade Pond 9A -P4 <br />DOZER <br />7.01 <br />Regrade Ponds HR -PIA and HR -PIB <br />DOZER <br />10.08 <br />Replace Topsoil from Stockpile to Portal No. 9 <br />Berm <br />SCRAPERI <br />37.05 <br />Replace Topsoil from Stockpile to Portal Area <br />Refuse Pile <br />SCRAPERI <br />5.71 <br />Replace Topsoil from NW Stockpile to Refuse Pile <br />SCRAPERI <br />10.83 <br />Replace Topsoil from NE Stockpile to Refuse Pile <br />SCRAPERI <br />7.63 <br />Replace Topsoil from #9 Berm to Refuse Pile <br />SCRAPERI <br />0.53 <br />Replace Topsoil from Stockpile to Portal No. 5 <br />Facilities <br />SCRAPERI <br />22.66 <br />Replace Topsoil from Stockpile to Portal No. 5A <br />SCRAPERI <br />15.70 <br />Replace Topsoil from Stockpile to Portal No. 9 <br />Yard Area <br />SCRAPERI <br />41.82 <br />Replace Topsoil from Stockpile to Old Shop Area <br />DOZER <br />0.47 <br />Replace Topsoil from Stockpile to 7 -North Angle <br />Well Area <br />DOZER <br />0.13 <br />Replace Topsoil from Stockpile to Access Road to <br />Mine No. 5 <br />DOZER <br />0.13 <br />Replace Topsoil from Stockpile to Access Road <br />SCRAPERI <br />0.57 <br />Seed Reclaimed Area with Rangeland /Wildlife <br />Mix <br />REVEGE <br />508.20 <br />Reseed Cropland Areas <br />REVEGE <br />56.25 <br />Reseed Reclaimed Areas with Pasture Mix <br />REVEGE <br />72.20 <br />Weed Spraying - 10% or the Area,Twice /Year for <br />Ten Years <br />REVEGE <br />850.00 <br />Regrade Main Substation <br />DOZER <br />1.11 <br />Replace Topsoil from Stockpile to Main Substation <br />and Access <br />DOZER <br />0.16 <br />Place Cover on Non -Coal Waste Disposal Area <br />DOZER <br />4.49 <br />Replace Topsoil from Stockpile to Non -Coal <br />Waste Disposal <br />DOZER <br />2.06 <br />Regrade Amoco Pipeline Road <br />DOZER <br />2.12 <br />Regrade Sediment Control Ditches <br />DOZER <br />23.82 <br />Replace Topsoil from Stockpile to Amoco Pond <br />DOZER <br />0.24 <br />Site Maintenance and Pond Cleaning <br />SITEMAINT <br />ENANCE <br />400.00 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />5.00 <br />Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE <br />3.33 <br />Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE <br />23.33 <br />Mobilize/Demobilize Equipment for Pond <br />Cleaning <br />MOBILIZE <br />3.33 <br />SUBTOTALS: <br />7104.33 <br />$3,026,494.64 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% Total = $61,135.19 <br />Performance bond: 1.05% Total = $31,778.19 <br />CIRCES Cost Estimating Software <br />