My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-04_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2013-09-04_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:44 PM
Creation date
9/17/2013 7:35:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
9/4/2013
Doc Name
3rd Adequacy Review & Cost Estimate
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
RN6
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 22 of 136 <br />BULLDOZER WORK <br />Task description: Regrade Overland Conve3 <br />Site: Williams Fork Mines Permit Action <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 9/6/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />APMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Corridor <br />Permit Renewal 06 Permit /Job #: C1981044 <br />Abbreviation: None <br />Filename: C044 -011 <br />Total unit Cost/Hour: $331.45 <br />Total Fleet Cost/Hour: $1,325.80 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$110.68 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $331.45 <br />Total Fleet Cost/Hour: $1,325.80 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />5,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />5,625 LCY <br />Source of estimated volume: Map 26; July 1993 Inspection Estimate <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,748.7 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />5% <br />5.400 feet <br />2.650 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.