Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 003 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.40 <br />0.40_ <br />0.40 <br />0.40 <br />0.15 <br />NA <br />0.15 <br />NA <br />1.10 <br />0.80 <br />Total job time: <br />Total job cost: <br />Page 2 of 2 <br />LAKE GEORGE <br />10.00 miles <br />25.00 mph <br />$710.77 <br />$0.00 <br />2.20 Hours <br />$710.77 <br />CIRCES Cost Estimating Software <br />