My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-16_PERMIT FILE - M2013056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013056
>
2013-09-16_PERMIT FILE - M2013056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:05 PM
Creation date
9/16/2013 4:45:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013056
IBM Index Class Name
PERMIT FILE
Doc Date
9/16/2013
Doc Name
Permit application, Adequacy Review
From
DRMS
To
Richard Fretterd
Email Name
TCW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Fill in holes to final grade ( —1 acre total) <br />Site: Ace in the Hole - CMC284074 Permit Action: Pre -Op Permit/Job #: M2013056 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 9/10/2013 County: Teller Filename: M056 -002 <br />User: TCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K XL - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Total unit Cost/Hour: $75.79 <br />Total Fleet Cost/Hour: 575.79 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,210 <br />Swell factor. 1.000 <br />Loose volume: 1,210 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 169.6 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />9,000 feet <br />2,550 lbs/LCY <br />Gravel - Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour <br />$11.21 <br />NA <br />Operating Cost/Hour: <br />$27.17 <br />100 <br />Ripper op. Cost/Hour. <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $75.79 <br />Total Fleet Cost/Hour: 575.79 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,210 <br />Swell factor. 1.000 <br />Loose volume: 1,210 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 169.6 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />9,000 feet <br />2,550 lbs/LCY <br />Gravel - Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.