Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost Estimate 2013 <br />Site: Anus Dei Lode Claim <br />PROJECT IDENTIFICATION <br />Permit Action: Pre -Op Permit/Job #: M2013052 <br />Task #: 001 State: Colorado <br />Date: 9/11/2013 County: El Paso <br />User: TCW <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M052 -001 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />002 <br />003 <br />004 <br />Hand crew for backfilling, 1000 yd3, —30/hr <br />NA <br />1 <br />1 <br />1 <br />110.00 <br />$3,300.00 <br />$1,920.00 <br />$300.00 <br />Seeding (broadcast, 50% failure, <br />$16 /lb *401b /ac *2acres) <br />NA <br />8.00 <br />Mob /demob to site (hiking 2 hr each way * 5 days) <br />NA <br />10.00 <br />SUBTOTALS: <br />128 <br />$5,520.00 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />1.05% <br />0.00 hrs <br />10.00% <br />Total = <br />$111.50 <br />Total = <br />$57.96 <br />Total = <br />$0.00 <br />Total = <br />$552.00 <br />TOTAL O & P = <br />$721.46 <br />CONTRACT AMOUNT (direct + O & P) = <br />$6,241.46 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$312.07 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,033.53 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,553.53 <br />