Laserfiche WebLink
Reclamation Timetable <br />The timetable for completion of each phase of the reclamation plan for individual portal and facility areas <br />is shown on Table 67, Reclamation Timetable. <br />Reclamation Cost <br />The costs associated with the reclamation plans outlined in this permit submittal are detailed in Exhibit <br />25, Reclamation Bond. <br />Area - Specific Reclamation Plans <br />The following provide discussions of the detailed site - specific reclamation plans for the following portal <br />or facility areas: <br />• No.5 Portal <br />• No. 5A Portal <br />• Overland Conveyor <br />• No. 9 Portal Area <br />• Waste Disposal Site (approved) <br />• No. 5 and No.6 Mine Water Handling Systems <br />• Fresh Water System <br />• Red Rock Crusher <br />• Old Shop Area (EC Village) <br />• Utah Tract <br />• Miscellaneous Areas <br />• Multiple Service Buildings <br />• Solid Waste Disposal Area <br />No.5 Portal Area <br />The No.5 Portal Area was initially disturbed in the early 1970 °s, prior promulgation of SMCRA and the <br />related State regulatory program. As such, the surface facilities for this area were developed in a manner <br />inconsistent with currently- accepted mining and reclamation practices. Specifically, during development <br />of the portal area, topsoil was not salvaged from the site. <br />This topsoil deficiency was addressed by salvaging additional topsoil during construction of the drainage <br />and sediment control system. In addition, up to 24 inches of topsoil was salvaged during the recent <br />construction of a new shop, the wastewater treatment facility, and the No.5 and No.6 mine water - handling <br />system. Please refer to Table 58, Topsoil Replacement - No.5 Portal and General Area, found in Section <br />2.03.3 Operation Plan, Permit Area, for topsoil replacement volumes. The topsoil volumes salvaged <br />during these most recent construction activities are summarized in Table 68, No.5 Portal- Recent Topsoil <br />Salvaged Volumes. <br />Reclamation of the No.5 portal area will follow the general steps outlined at the beginning of this section., <br />with the following minor modifications. All structures and facilities will be removed from the site. This <br />will include, but not be limited to the removal of the railroad tracks, scale - house. coal silo, coal conveying <br />system, rotary breaker, screening plant, reclaim, tunnel. all offices, shoe/ ->7,7 rehouse. Eabotar�b�,r <br />bathhouses, rock -dust tanks, electrical substation, fcncli,g, and the c1 _ ,erlan �C,rGE7�'r <br />associated structures. Mobile trailers, including the adimini-strati.on office tr ct i I 1. ,, if 1- , %,7Ff <br />TR' 7 <br />