Laserfiche WebLink
3.0 BOND RELEASE SUMMARY <br />MCM (or their predecessors in interest) has completed reclamation of two surface mine disturbance <br />areas; the Utah Tract and the Williams Fork Strip Pit; two underground mine portal areas; the No 5 <br />Mine Portals and the No. 9 Mine Portals (which includes the No. 9 Mine Refuse Area); and facilities <br />demolition and site stabilization of several surface facilities including; the Women's Bathhouse, <br />Visitor Bathhouse, No. 5 Mine Substation, Men's Bathhouse; Laboratory Trailer and Sample Storage <br />Shed; two rock -dust tanks; the Brazell -Simms Building; the No. 9 Mine Warehouse, Portal Area, and <br />Refuse Disposal Area; the Reclamation Storage Building; and miscellaneous buildings and facilities <br />(Compressor House, Okey -Plaza Well- House, Brazell -Simms Well- House, Old Carpenter Shop, and <br />Guard -Shack and Warehouse fencing). <br />Consistent with applicable regulatory provisions for partial bond release under Rules 3.03.1(2)(a) and <br />(b), MCM is requesting DRMS approval for: <br />Phase 1 and 2 partial bond release for completion of backfilling, grading and drainage control <br />in the Utah Tract and the Williams Fork Strip Pit in accordance with applicable provisions of <br />Rule 3.03.1(2)(a). This component of the requested partial bond release includes Phase 1 <br />partial bond release (at 60 %) for the Post -Law portion of the Williams Fork Strip Pit (62.7 <br />acres), and Phase 1 and 2 partial bond release (at 85 %) for the Utah Tract (199.0 acres) and <br />Pre -Law portion (32.7 acres) of the Williams Fork Strip Pit. <br />Phase 1 and 2 partial bond release for sealing and backfilling the No. 5 and No. 9 Mine Portals <br />(includes No. 9 Mine Refuse Area) and regrading, drainage reestablishment, soil replacement, <br />reseeding, and vegetative reestablishment for the associated disturbance areas. This component <br />of the requested partial bond release includes Phase 1 and 2 partial bond release (at 85 %) for <br />these areas (18.2 acres). <br />Phase 1 partial bond release for completion of facilities demolition and site stabilization <br />(backfilling, grading, soil replacement, and reseeding) for a number of buildings and structures <br />reclaimed in 1996 -1998 and 2008 -2009. This component of the requested partial bond release <br />includes Phase 1 partial bond release (at 60 %) for these areas (4.6 acres). <br />The total requested Phase 1 partial bond release amount is $154,621, and the Phase 2 partial bond <br />release amount is $782,550, for a total requested bond release of $937,171. <br />