Laserfiche WebLink
1111 g Y <br />Moffat County Mining, LLC <br />RECEIVED <br />SIp 13 2013 <br />ama <br />5I-, 3 <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />Mr. Zach Trujillo September 10, 2013 <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street — Room 215 <br />Denver, Colorado 80203 <br />303.866.3567 Ext. 8164 <br />Re: Moffat County Mining, LLC — Williams Fork Mines (C -81 -044), Application for Partial Bond Release for <br />Completion of Reclamation Activities for Utah Tract and Williams Fork Strip Pit, and Partial Reclamation of <br />Mine 5 and 9 Portal Areas and Other Mine Facilities <br />Dear Mr. Trujillo: <br />The State of Colorado, through the Colorado Department of Natural Resources (DNR), currently holds a <br />reclamation bond in the amount of $3,612,679 as surety for final reclamation of mining disturbance areas <br />associated with Moffat County Mining, LLC's (MCM) Williams Fork Mines (Mines) near Craig, Colorado. <br />With this application, MCM is requesting Phase 1 and 2 partial bond release for completion of reclamation, as <br />outlined in the approved Permit document, for the Williams Fork Strip Pit and Utah Tract. MCM is also <br />requesting Phase 1 and 2 partial bond release for sealing, backfilling, and grading the No. 5 and No. 9 Portals <br />and Old Shop Area, and reclaiming the No. 9 Mine Refuse Area, and a Phase 1 partial bond release for <br />completion of facility demolition, backfilling and grading, and site stabilization for various mine facilities <br />reclaimed during the periods 1996 -1998 and 2008 -2009. The total requested bond release amount is $937,171. <br />Phase 1 and 2 partial bond release is requested for completion of final reclamation for the approximately 199 <br />acres reclaimed in the Utah Tract and 95.4 acres in the Williams Fork Strip Pit area. Mined lands in both of <br />these areas have been backfilled, regraded, effective drainage has been reestablished, soil materials have been <br />replaced, and revegetation seeding has resulted in a stable vegetation community which is compatible with the <br />approved postmining land uses of rangeland and wildlife habitat. Revegetation success sampling indicates that <br />the reestablished vegetation communities for the Utah Tract and the Pre -Law portion of the Williams Fork Strip <br />Pit meet the applicable revegetation success standards, making these areas eligible for Phase 2 bond release. <br />The Post -Law portion of the Williams Fork Strip Pit fell just short of meeting the revegetation success standards <br />for total vegetative cover and shrub density, so the bond release request for this area is limited to the Phase 1 <br />release at this time. <br />Phase 1 and 2 partial bond release is requested for sealing, backfilling, regrading, site stabilization, soil material <br />replacement, and revegetation seeding for the No. 5 and No, 9 Portals, the No. 9 Mine Refuse area and the Old <br />Shop area. Disturbed lands associated with these areas have been reclaimed, interim revegetation success <br />evaluations have been completed, but final revegetation success evaluations have not yet been completed for <br />these recently reclaimed areas. <br />Phase 1 partial bond release is requested for completion of facilities demolition, grading, soil material <br />replacement, and revegetation seeding for the Old Mine Office Building, Women's Bathhouse, Visitor <br />Bathhouse, Men's Bathhouse, No. 5 Mine Substation, Laboratory Trailer and Sample Storage Shed, two rock - <br />dust tanks, the Brazel -Simms Building, No. 9 Mine Warehouse, Rock Crusher Site and Equipment, Reclamation <br />Storage Building (Pole Barn), and sealing the Okie Plaza Well. <br />The individual bond release components and calculations, as detailed in the accompanying Bond Release <br />Summary, result in a total requested bond release amount of $937,171, based on estimated reclamation costs, as <br />