Laserfiche WebLink
�•CO� <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />/876 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 2000 -080 site Name: Pioneer Farm <br />county Arapahoe TR# (DRMS Use onlyl <br />Permittee: Pioneer Sand Company RECEIVIet) <br />rp <br />Operator (If Other than Permittee): 2 2013 <br />Mike Au s b u rn QIVISION pF RECl�IpT10N <br />Permittee Representative: aun BAs x.f.. <br />Please provide a brief description of the proposed revision: <br />Please add post- mining land use of commercial/industrial in addition to approved post mining <br />'and use -vf des ideRttttea en Ex1•,i1•rrtpii F Reelamatien Plan Map <br />As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />1 IOc, 111, 112 construction F7 materials, and 1] 2 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />I I Od, 112d(l , 2 or 3) $1006 ❑ <br />