My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-11_REVISION - M1999033 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999033
>
2013-09-11_REVISION - M1999033 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:43 PM
Creation date
9/13/2013 7:16:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999033
IBM Index Class Name
REVISION
Doc Date
9/11/2013
Doc Name
New Amendment
From
Fremont County
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C MINING PLAN <br />Mining will commence in 1999 as soon as all permits are in hand and may continue for <br />long as ten years. The mine plan calls for the removal of the waste dump material with a <br />front end loader and processing on site. Portable screens and crusher, if necessary, will <br />be used on site to process the waste dump material for use as a road material. Road <br />material is the primary and only product to be mined at this site. The gravel product will <br />then be stockpiled on site prior to loading into county trucks for use on nearby roadways. <br />At this time, it is planned to sub - contract the gravel sizing and stockpiling in 30,000 ton <br />increments for annual usage on county roads. The first parcel described in the legal will <br />be processed first. The 3.4 acre parcel may contain up to 180,000 tons of gravel. During <br />the first 30000 ton increment mined, it may necessary to utilize the upper second (pit #2) <br />parcel for stockpiling of material. As the pit face progresses east to west, the finish <br />material will be stockpiled next to the working face. As the waste material is processed, <br />a 2% grade will be maintained from the pit entrance to the working face to minimize any <br />sediment being carried out of the pit area during rain events or snow melt. There is no <br />soil horizon developed at the surface of waste dumps, although trees and shrubs will have <br />to be removed prior to excavation. As mining of waste materials progresses to the <br />original surface(s), any organic material or soil horizons will be left in place or stockpiled <br />for reclamation at the end of mining. The location of topsoil or organic matter stockpiles, <br />if encountered, is shown on the Mining Plan Map. Along the contact will the natural <br />slopes, the waste dump material will be graded to no steeper than 3:1, H:V, and stabilized <br />via contour rilling to minimize erosion of the newly exposed dump material and(possibly) <br />original soils. Along the toe of the existing unstable waste dump in proximity to Howard <br />Creek, it may necessary to utilize back -hoes or excavators to remove waste dump <br />material with minimum disturbance to vegetation along Howard Creek, especially the <br />well developed stands of Cottonwoods. During mining operations, a four foot tall berm <br />of waste materials will be left along Howard Creek to maintain isolation of Howard <br />Creek flows into the mining area and restrict water flow from the mining area into <br />Howard Creek. After mining, the floor and slopes of the mining area will be seeded with <br />a mixture of native grasses, shrubs, and forties. <br />The affected land boundaries were carefully located to keep mining operations out of any <br />streams, springs, or Howard Creek proper. The exposed face(s) of the waste dumps do <br />not appear wet or show evidence of seeps or water flow. Where water flows do cross the <br />waste dump materials (west of the permit boundaries), the mining operator has elected to <br />not disturb that area and terminate mining in that direction. (Western limit of Pit #1). In <br />the event that mining operations intersect a flow of water or spring that was covered by <br />the waste dump construction and not visible at this point in time, a water quality control <br />plan will be followed. The goal of the plan will be to isolate, decant, and return the water <br />flow back to Howard Creek drainage in a manner that will minimize water quality <br />impacts. This may include the construction of small sediment ponds, berms, and/or <br />ditches to maintain good water quality in the drainage during and after gravel extraction <br />operations. Under no circumstances will equipment be permitted to operate or travel <br />
The URL can be used to link to this page
Your browser does not support the video tag.