Laserfiche WebLink
5 Clear vegetation, rocks and non -coal waste, and reshape and grade the following ditches as <br />necessary to restore them to the approved design: clean water diversion ditch above West Fan; <br />D29; D29B; D7; D9; D26 <br />6 Restore culvert C41 to its approved design, and backfill and grade around the inlet <br />7 Clear the upland diversion ditch above the RDA of fallen rocks and trees <br />8 Survey the entire length of the upland diversion ditch above the RDA to allow comparison of <br />constructed ditch with the approved design <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last <br />abatement due date <br />Abatement Step 4 <br />Due Date <br />1 <br />September 16, 2013 <br />2 <br />September 16, 2013 <br />3 <br />September 16, 2013 <br />4 <br />September 16, 2013 <br />5 <br />September 30, 2013 <br />6 <br />September 30, 2013 <br />7 <br />September 30, 2013 <br />8 <br />September 30, 2013 <br />