My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-09_ENFORCEMENT - C1981012 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981012
>
2013-09-09_ENFORCEMENT - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:52 PM
Creation date
9/12/2013 7:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
9/9/2013
Doc Name
Extension of Time for Abatement Notice
From
DRMS
To
New Elk Coal Company, LLC
Violation No.
CV2013008
Email Name
LDS
SB1
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />aivisiaM o <br />RECLAMATIC.N <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />SAFETY <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />I0]11101:I MUM WaW-AllIM.7_llaI oil I aRLVAIIIIa PS] =I:INLIIaIN01104 Ili I no] a oil bola 9011M <br />Cessation <br />CV- 2013 -008 <br />Notice of <br />CV- 2013 -008 <br />Order No. <br />Violation No. <br />Date NOV or <br />August 22, 2013 <br />Permit No.: <br />C- 1981 -012 <br />CO Issued: <br />Mine: <br />New Elk Mine <br />County: <br />Las Animas <br />Operator (If <br />New Elk Coal Company, LLC <br />Type of Mine: <br />Underground <br />Other than <br />Permittee): <br />Mail Address: <br />12250 Highway 12 <br />Permittee: <br />New Elk Coal Company, LLC <br />Weston, CO 81091 <br />Mail Address: <br />12250 Highway 12 <br />Weston, CO 81091 <br />In Violation CV- 2013 -008, the deadline for abatement of the practice, condition or violation described <br />was fixed as described below. It is hereby found that the operator has failed to abate such practice, <br />condition or violation, or cannot complete abatement within the time allowed, but that such failure is <br />not due to lack of diligence on the part of the operator. The time for abatement is therefore extended <br />as follows: <br />Abatement Description <br />Step <br />6 Restore culvert C41 to its approved design, and backfill and <br />grade around the inlet <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: September 9, 2013 <br />By: l-- . <br />(Signature of Authorized Representative) <br />Leigh D. Simmons <br />Environmental Protection Specialist <br />Original Date <br />Due <br />September 30, <br />2013 <br />Extended <br />Due Date <br />November 4, <br />2013 <br />[Signature of Division Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Division's justification for <br />approving the extension beyond 90 days is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.