o The ditch is designed to convey the 100 yea r/24 hour event; although several large <br />storms had occurred in the weeks preceding the inspection, the Division has no reason <br />to think that any were on the order of the 100 year /24 hour event <br />Pertaining to Good Faith <br />o Immediately the problem was identified (late in the afternoon of Thursday 25th, as it <br />started to rain) NECC sent staff to attempt to remediate the problem. Bobby Steele was <br />just able to repair the breach, but the wet ground made work hazardous <br />o Only one step is required to abate the violation: Ditch D14 should be restored to the <br />approved design <br />o The due date for the abatement step was originally set at 9/16/2013, but has been <br />extended to 11/4/2013 since the saturated ground is unable to support the equipment <br />necessary to complete the work <br />As of today, September 11, 2013, the NOV has not been terminated. <br />