Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 04A <br />Haul Route: <br />Page 3 of 3 <br />Seg # Haul Distance <br />Grade (° o) <br />Roll. Res Total Res Velocity <br />Travel <br />(Ft) <br />( %) ( °o) (fpm) <br />Time <br />(min) <br />1 1000.00 <br />2.50 <br />+ <br />3.00 5.50 1122 <br />0.953 <br />Haul Time: 0.953 <br />minutes <br />Return Route: <br />Seg # Haul Distance <br />Grade (° o) <br />Roll. Res Total Res Velocity <br />Travel <br />(Ft) <br />( %} (°o) (fpm) <br />Time <br />(min) <br />1 1000.00 <br />-2,50 <br />3.00 0.50 3080 <br />0.451 <br />Return Time: 0.451 <br />minutes <br />Total Truck Cycle Time: 5.117 <br />minutes <br />Loading Tool unit <br />Production 478.78 <br />LCY /Hour <br />Adjusted for job efficiency: <br />397.39 LCY /Hour <br />Truck Unit Production <br />253.83 <br />LCY /Hour <br />Adjusted for job efficiency: <br />210.68 LCY /Hour <br />Optimal No. of Trucks: 2 <br />Truck(s) <br />Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 421.35 LCY Hour <br />Adjusted single <br />truck/loader team production: 397.39 LCY/Hour <br />Adjusted multiple <br />truck/loader team production: 397.39 LCY Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) <br />Total job time: 8.10 <br />Hours <br />Unit cost: $1.217 <br />/LCY <br />Total job cost: $3,919.03 <br />CIRCES Cost Estimating Software <br />