Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />I Dozer(s) <br />Task # 03A <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT /DAY) <br />Spoil pile: <br />0.800 <br />(FND -RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.852 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: <br />0.5092 <br />Adjusted unit production: 154.44 LCY/hr <br />Adjusted fleet production: 154.44 LCY/hr <br />Fleet size: <br />I Dozer(s) <br />Unit cost: <br />$0.897 LCY <br />Total job time: <br />12.59 Hours <br />Total job cost: <br />$1742.98 <br />Page 2 of 2 <br />C[RCES Cost Estimating Software <br />