My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-21_REVISION - M1978116
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978116
>
2013-08-21_REVISION - M1978116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:12 PM
Creation date
9/11/2013 7:16:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978116
IBM Index Class Name
REVISION
Doc Date
8/21/2013
Doc Name
Reclamation Cost Estimate.
From
DRMS
To
Cotter Corp.
Type & Sequence
AM2
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: <br />Site: SM -18 Mine Permit Action: AM -02 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 8,2 1 2013 County: Montrose <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: M1978116 <br />Abbreviation: None <br />Filename: M116 -001 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />Ola <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />08a <br />Demolition <br />DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />16.00 <br />$9,080.97 <br />$15,587.60 <br />$1,742.98 <br />$3,919.03 <br />$2,363.00 <br />$3,805.20 <br />$17,622.02 <br />$10,457.61 <br />Mine seal for east and west protals <br />MINESEAL <br />40.00 <br />Re- contour mine waste dump <br />DOZER <br />12.59 <br />Spreading 6" topsoil over 4 acres disturbance <br />TRUCKI <br />8.10 <br />Pock mine waste area <br />EXCAVATE <br />25.I6 <br />Seal 4 vent holes <br />MINESEAL <br />0.00 <br />Reve etate an estimated 6 acres Disturbance <br />REVEGE <br />40.00 <br />Mobilization <br />MOBILIZE <br />11.00 <br />SUBTOTALS: <br />152.85 <br />$64,578.41 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total <br />$1,304.48 <br />Performance bond: <br />1.05% <br />Total = <br />$678.07 <br />Job superintendent: <br />76.43 hrs <br />Total = <br />$4,998.96 <br />Profit: <br />10.00% <br />Total _ <br />$6,457.84 <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />$87,671.76 <br />TOTAL O & P = <br />$13,439.35 <br />CONTRACT AMOUNT (direct + O & P) _ <br />$78,017.76 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />500.00 Total = <br />500.00 <br />Engineering work and/or contract/bid preparation: <br />4.250o Total = <br />$3,315.75 <br />Reclamation management and /or administration: <br />5.0010 <br />$3,900.89 <br />CONTINGENCY: <br />3.00 Total = <br />$1,937.35 <br />TOTAL INDIRECT COST = <br />$23,093.35 <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />$87,671.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.