My WebLink
|
Help
|
About
|
Sign Out
Home
2020-06-17_ENFORCEMENT - C1980007
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1980007
>
2020-06-17_ENFORCEMENT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:47:29 AM
Creation date
6/17/2020 7:38:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
6/17/2020
Doc Name
Cessation Order
From
DRMS
To
Mountain Coal Company, LLC
Violation No.
CO2020001
Email Name
LDS
JRS
JDM
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All surface disturbing activities in the Sunset Roadless area must cease immediately, except as <br /> expressly permitted herein. <br /> 2. All travel on roads and drill pads constructed in longwall panels LWSS-2, LWSS-3, and LWSS-4 that <br /> are within the Sunset Roadless Area. <br /> 3. All equipment must be removed from the Sunset Roadless area unless it is actively being used for <br /> surface stabilizing activities and maintenance to prevent offsite impacts. <br /> 4. Mountain Coal may continue to access the roads and drill pads in longwall panel LWSS-1 and conduct <br /> surface stabilization and maintenance activities as necessary. No new construction activities are <br /> permitted in LWSS-1. <br /> 5. Mountain Coal may conduct ground stabilization activities in longwall panels LWSS-2, LWSS-3, and <br /> LWSS-4 to prevent offsite impacts pursuant to the Colorado Surface Coal Mining Reclamation Act. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br /> Abatement Step Description <br /> 1 Notwithstanding BLM leases C-1362 and COC-67232, Mountain Coal must provide the <br /> Division with detailed information regarding its assertion that it maintains legal right of <br /> entry to the Sunset Roadless area and why it is not in direct conflict with the District Court <br /> order vacating the North Fork Exception to the Colorado Roadless Rule. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br /> ON OR BEFORE last abatement due date <br /> Abatement Step 9 Due Date <br /> 1 September 14, 2020 <br /> Affirmative Obligation(s) to Abate Imminent Danger or Harm, if Applicable`: <br /> Mountain Coal must immediately cease all surface disturbing activities in the Sunset Roadless area at the West <br /> Elk Mine. Mountain Coal may conduct surface stabilization activities as necessary to prevent off-site impacts <br /> pursuant to the Colorado Surface Coal Mining Reclamation Act. <br /> If imminent danger to public health and safety or imminent environmental harm is found to exist. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.