Laserfiche WebLink
J. Describe and locate any structures to be constructed (i.e. stockpiles, ponds, <br /> impoundments): <br /> Temporary wooden drill platform will be constructed. It will be dismantled and moved <br /> either to the next location or off-site after the hole Is completed and appropriately <br /> abandoned. <br /> K. Describe anticipated relationship to surface water and groundwater (proximity to <br /> streams,penetration of ground water aquifers): <br /> CO State Land Board requires a 500 ft. setback from Grape Creek. This setback will be <br /> maintained from Grape Creek outside SLB Section 16 as well. <br /> IV. OPERATION AND RECLAMATION MEASURES: <br /> 1. The Board suggests that a photographic record of the pre-prospecting and <br /> post-prospecting conditions be kept by the prospector. These photos should be taken <br /> from the same location and by the same method to clearly show the pre-prospecting <br /> condition of the land and the reclamation efforts. Upon completion of reclamation and <br /> request for bond or surety release, the Board may consider the photos as evidence of <br /> adequate reclamation,and thus,be able to act more quickly on the request for release. <br /> 2. Provide a description of the native vegetation of the area to be disturbed, including <br /> tree, shrub, and grass communities of the area. Color photographs, sufficient to <br /> adequately represent the ecology of the site and adequately labeled (including date, <br /> orientation and location), may be used in lieu of a written description. Based on the <br /> quality of the photographs,the Division may require additional detail. <br /> Because the target areas are within BLM's Wilderness Study Area, native vegetation <br /> with a trunk diameter greater than two inches cannot be disturbed. In addition, surface <br /> disturbance is not anticipated as the wooden platform will he sAt on the ground surface <br /> Form 2—Public File Page 8 of 14 <br />