Laserfiche WebLink
2.2 Generate a Water Budget <br />7. CDSS Water Budget and CU & Losses Tool <br />CDSS -- 1 <br />Generate a Water Budget <br />Generate a <br />CU and Losses Summary <br />Generate the Colorado River Basin <br />Tributaries in Colorado <br />CU and Losses Report <br />Exit Program <br />Figure 2 - State Water Budget Reporting Tool, Main Form — Water Budget Utility <br />To create a water budget, click on the 'Generate a Water Budget' button within the CDSS Water <br />Budget Reporting tool as shown in Figure 2 above. The Water Budget Setup user form, as shown <br />In Figure 3, then opens to allow the user to <br />begin entering data needed to perform the <br />water budget analysis. <br />2.2.1 Setting up the Water Budget <br />It is recommended that the Water Budget <br />Setup form be completed in the order <br />shown. <br />For Step 1, select the time scale on which <br />the water budget will be based. Once the <br />time scale has been defined, the Specify <br />Data button in Step 2 becomes activated. <br />Clicking on the Specify Data button opens <br />another form called Water Budget Input <br />Data. Depending on the time scale selected, <br />this will display either Figure 4 (Average <br />Annual Inputs Form) or Figure 5 (Annual or <br />Monthly Inputs Form). <br />1 Select the time scale for the data on which the Avg Annual <br />water budget will be based. 0 Annual <br />(All input files must contain the same time scale: <br />monthly data must be in calendar year) & Monthly <br />2 Specify the the input data. <br />Specify Qata <br />? Enter a begin and end year for the analysis. Start: End: <br />�AII input files must include data for entire date range) F 1 775 2005 <br />4 Select water budget component to be used Native Vegetation CU <br />for calculation of the residual. <br />5 Enter a title and up to 2 subtitles for the simulation <br />Title: <br />Nest V rater Budget Tool <br />Subtitle 1: Subtitle 1 <br />Subtitle 2 ISubitle 2 <br />CREATE WATER BUDGET I Load Previously Saved scenario <br />Return to Main Form <br />Figure 3 - Water Budget Setup Form <br />Page 9 <br />