My WebLink
|
Help
|
About
|
Sign Out
Search
FLOODC00270
CWCB
>
Floodplain Documents
>
Backfile
>
11001-12000
>
FLOODC00270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:24 AM
Creation date
9/30/2006 6:54:46 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Title
Chatfield Reallocation Study: Storage Use Patterns 2/1/2003
Date
2/1/2003
Prepared For
Jefferson County / Arapahoe County
Prepared By
US Army Corps of Engineers/CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1697 CoI, Boul.-varo <br />Suite 200 <br />Golden, Colorado 80401 <br /> <br />To!, (303) 239-5400 <br />F"" (303) 239-5454 <br /> <br />www.brownandcaldwell.com <br /> <br />i"t: <br /> <br />(C", j. <br />Uv. <br /> <br />January 30, 2003 <br /> <br />. - Ii ;,[~n ~.._ ,~. , , . . -. ,~, <br /> <br />BROWN AND <br />CALDWELL <br /> <br />Mr. Lany F. Lang, P.E. <br />Chief, Flood Control Section <br />Colorado Water Conservation Board <br />1313 Sherman St., Room 721 <br />Denver, CO 80203 <br /> <br />SUBJECT: Final Report for Storage Use Patterns Investigation for Chatfield <br />Reservoir Reallocation Study <br /> <br />Dear Mr. Lang: <br /> <br />Brown and Caldwell is pleased to submit the Final Report for the Storage Use Patterns <br />Investigation for Chatfield Reservoir Reallocation Study. <br /> <br />The principal fmclings from this investigation indicate that those entities expressing <br />interest in acquiring and utilizing reallocated storage space in Chatfield Reservoir have <br />sufficient available water rights to allow these entities to make efficient use of at leas! <br />20,600 acre-feet of reallocated Chatfield Reservoir storage. <br /> <br />If the new HEC-S runs by the Omaha District, U.S. Army Corps of Engineers for <br />investigating Chatfield Reservoir, Bear Creek Reservoir and Cheny Creek Reservoir <br />System operations indicate potential for reallocating more than 20,600 acre-feet of <br />storage in Chatfield Reservoir, the analysis described in this report for determining the <br />effects of reallocating Chatfield Reservoir storage could be repeated for a larger <br />reallocated storage pool. <br /> <br />Brown and Caldwell believes that reallocation of Chatfield Reservoir storage is an <br />important project for resolving some of the Denver Metro area water supply problems. <br />We are proud to have been associated with a portion of this investigation. Thank you <br />for giving us this opponunity. <br /> <br />Sincerely, <br /> <br /> <br />BROWN )~ll <br /> <br />~,A>> <br /> <br />eo M. Eisel, Ph.D., P.E. <br />Project Manager <br /> <br />P: \Data \GEN\CWCB\Chatfield\Repon12.02\Letter of Tr:msmittall.30.03.doc <br /> <br />Environmental Engin~~rs & Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.