Laserfiche WebLink
costilla.rep <br />River: Rio Seco Reach: 1 R5: 2373 Profile: 50-Year <br />warning:The energy equation could not be balanced within ~he specified number of iterations. The <br />program used critical depth <br />for the water surface and continued on with the calculations. <br />warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the need for <br />additional cross sections. <br />Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 <br />or greater than 1.4. <br />This may indicate the need for additional cross sections. <br />Warning :The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross <br />section. This may indicate <br />the need for additional cross sections. <br />warning:~uring the standard step iterations, when the assumed water surface was set equal to <br />critical depth, the calculated <br />water surface came back below critical depth. This indicates that there is not a. valid <br />subcritical answer. The <br />program defaulted to critical depth. <br />Note: Multiple critical depths were found at this location. The critical depth with the lowest, <br />valid, water surface was <br />used. <br />River: Rio Seco Reach: 1 R5: 2373 Profile: 100-Year <br />warning:The energy equation could not be balanced within the specified number of iterations. The <br />program used critical depth <br />for the water surface and continued on with the calculations. <br />warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the need for <br />additional cross sections. <br />warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 <br />or greater than 1.4. <br />This may indicate the need for additional cross sections. <br />warning :The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross <br />section. This may indicate <br />the need for additional cross sections. <br />warning:DUring the standard step iterations, when the assumed water surface was set equal to <br />critical depth, the calculated <br />water surface came back below critical depth. Th's indicates that there is not a valid <br />subcritical answer. The <br />program defaulted to critical depth. <br />Note: Multiple critical depths were found at this location. The critical depth with the lowest, <br />valid, water surface was <br />used. <br />River: Rio Seco Reach: 1 RS: 2373 Profile: 200-Year <br />Warning:The energy equation could not be balanced within the specified number of iterations. The <br />program used critical depth <br />for the water surface and continued on with the calculations. <br />warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the need for <br />additional cross sections. <br />warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 <br />or greater than 1.4. <br />This may indicate the need for additional cross sections. <br />Warning :The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross <br />section. This may indicate <br />the need for additional cross sections. <br />warning:DUring the standard step iterations, when the assumed water surface was set equal to <br />critical depth, the calculated <br />water surface came back below critical depth. This indicates that there is not a valid <br />subcritical answer. The <br />program defaulted to critical depth. <br />Note: Multiple critical depths were found at this location. The critical depth with the lowest, <br />valid, water surface was <br />used. <br />River: Rio Seco Reach: 1 R5: 2373 Profile: 500-Year <br />warning:The energy equation could not be balanced within the specified number of iterations. The <br />program used critical depth <br />for the water surface and continued on with the calculations. <br />warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the need for <br />additional cross sections. <br />warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 <br />or greater than 1.4. <br />This may indicate the need for additional cross sections. <br />Warning :The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross <br />section. This may indicate <br />the need for additional cross sections. <br />warning:DUring the standard step iterations, when the ass~med water surface was set equal to <br />critical depth, the calculated <br />water surface came back below critical depth. This indicates that there is not a valid <br />subcritical answer. The <br />program defaulted to critical depth. <br />Note: Multiple critical depths were found at this location. The critical depth with the lowest, <br />valid, water surface was <br />Page 14 <br />