Laserfiche WebLink
2. Yampa River Projects and Special <br />Operations <br />This section contains information that was gathered during initial data collection efforts for <br />the CDSS project, in 1994 and 1995. It was assembled after interviewing Division 6 <br />personnel, as well as project owners and operators. The first seven sections relate to specific <br />diversions, and the remaining sections describe reservoirs: <br />Section Description <br />^ 2.1 Stillwater Ditch <br />^ 2.2 Sarvis Ditch <br />^ 2.3 Other Transbasin Diversions <br />^ 2.4 Snowmaking Diversions <br />^ 2.5 Key Municipal Water Systems <br />^ 2.6 Colorado Utilities Ditch and Pipeline (Hayden Station) <br />^ 2.7 Craig Station Ditch and Pipeline <br />^ 2.8 Stillwater Reservoir No. 1 <br />^ 2.9 Yamcolo Reservoir <br />^ 2.10 Stagecoach Reservoir <br />^ 2.11 Allen Basin Reservoir <br />^ 2.12 Lake Catamount <br />^ 2.13 Fish Creek Reservoir <br />^ 2.14 Steamboat Lake <br />^ 2.15 Elkhead Creek Reservoir <br />^ 2.16 Lester Creek Reservoir (Pearl Lake) <br />2.1. Stillwater Ditch <br />The Stillwater Ditch (a.k.a. the Five Pines Mesa Ditch) is a major diversion facility in the <br />upper reaches of the Bear River and is operated by the Stillwater Ditch and Reservoir <br />Company. The ditch diverts its supply from the outlet works of Yamcolo Reservoir and <br />delivers a portion of the water for irrigation in the area of Five Pines Mesa, which is <br />tributary to the Bear (Yampa) River basin and a portion out-of--basin to the Egeria Creek <br />Yampa River Basin Information 2-1 <br />