My WebLink
|
Help
|
About
|
Sign Out
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 3 <br />Riverside Canal Augmentation Plan System Recharge Water Rights <br />Di <br />h Recharge Site at end of Capacity / Supply <br />tc Ditch Target Amount Admin. No. A .Date <br /> <br /> <br />Riverside Riverside Canal <br />Recharge Area <br />(ID 0100503 Rch) <br />19,860 ac-ft* <br />323 cfs <br />44699.0 <br />5/19/1972 <br />Canal Goodrich (ID 0102032) 1,010.2 ac-ft 1,010.2 ac-ft 46751.45836 6/30/1975 <br />(ID 0100503) E uus (ID 0102049) 4,210 ac-ft 4,210 ac-ft 50466.0 3/3/1988 <br /> Sublette (ID 0102031) 664 ac-ft 664 ac-ft 50769.49378 3/11/1985 <br /> Headley (ID 0102037) 5,665 ac-ft 5,665 ac-ft 51356.0 8/10/1990 <br />* Equal to 323 cfs * 1.9835 ao-ftldy/cfs * 31 days <br />Augmentation Plan Operations <br />Operating rules to replace river depletions from well pumping include the following in order of <br />use: <br />1. Well depletions (stored under plan ID 0102522) should be replaced year-round by natural <br />flows when in priority, i.e., when no downstream call or when downstream call is junior to <br />most junior priority date for wells in Riverside Canal augmentation plan system. <br />2. Well depletions (stored under plan ID 0102522) should be replaced year-round with available <br />recharge accretions from canal seepage (stored under plan ID 0102522_P1C) and recharge <br />seepage (stored under plan ID 0102522_P1R). <br />3. Remaining well depletions met with release of storage water in Riverside Reservoir (ID <br />0103651). The canal company has never released water from Riverside Reservoir to receive <br />direct credit in the river. <br />4. Remaining well depletions (stored under plan ID 0102522) met by pumping augmentation <br />wells. Lagged depletions from augmentation well pumping represent an additional demand <br />on the well augmentation plan (stored under plan ID 0102522). <br />A-66 ofA-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.