My WebLink
|
Help
|
About
|
Sign Out
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A-11 Lower Latham Reservoir Company Augmentation Plan - <br />Plan ID 0103332 <br />The Lower Latham Reservoir Company Augmentation Plan (Lower Latham) covers wells <br />located within the Lower Latham Ditch service area. The Lower Latham augmentation plan <br />application is still pending (Case No. 03CW74) and has been operated under an SWSP since <br />2003. Prior to filing the Water Court application, about half of the wells were covered by GASP <br />and half covered by Central GMS. Forty-five (45) of the wells in the plan are still covered by <br />Central GMS. <br />The number of wells associated with the augmentation plan from sources reviewed for this effort <br />is summarized in Table 1. <br />Table 1 <br />Wells Associated with Lower Latham Reservoir Company Augmentation Plan <br />(Plan ID 0103332) <br />Source Number of Wells <br />03CW47 Water Court a lication & 1st and 2" amendments 99 <br />H droBase association (Version 20060816) 89 <br />Tied to acreage in GIS Irrigated Acreage Assessment* 89 <br />User interview 94 (2003), 92 (2006), 85 (2007) <br />* Subset of HydroBase association using wells decreed for irrigation with decreed rates greater than 50 gpm and specifically tied <br />to lands in the 2001 Irrigated Acreage Assessment. <br />System Overview <br />The Lower Latham augmentation plan has been using ditch shares to make summer replacements <br />and reusable effluent from the City of Longmont to make winter replacements. Well depletions <br />are calculated using crop demands with the IDS-CU program. Lagged accretions to the South <br />Platte River from well pumping are accounted via the Glover method with the AWAS program. <br />None of the wells are metered. Out-of-priority lagged well depletions are generally administered <br />in the river in aggregate with a common priority date. Administration of the plan at multiple <br />locations has occurred under SWSP operations once in the past, which will likely be more <br />commonplace in the future. <br />Recommendations <br />See general information related to augmentation plan demands, supplies, and operations below. <br />Augmentation Plan Demands <br />Lagged depletions and the supplies used to meet those obligations should be accounted in two <br />Lower Latham Well Depletions Plan structures: <br />• Above Riverside Canal (ID 0103332_1) <br />• Below Riverside Canal (ID 0103332_2) <br />A-59 ofA-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.