My WebLink
|
Help
|
About
|
Sign Out
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ditch loss at those times. Per the decree, lagged accretions to the South Platte River from <br />diversions to recharge are accounted via the Stream Depletion Factor (SDF) method. None of the <br />wells were historically metered or have calibrated electric coefficients; therefore, no actual pump <br />records are available. Out-of-priority lagged well depletions are administered in the river below <br />the Fort Morgan Canal headgate with a common priority date. <br />Recommendations <br />Recommendations for representing the Fort Morgan R&I Co. augmentation plan in the initial <br />development of the SPDSS StateMod Water Resources Planning Model input files are presented <br />below based on review of the W-2692 decree and interviews with canal company personnel and <br />Division 1 personnel. <br />Augmentation Plan Demands <br />To represent pumping for the entire SPDSS study period (1950 to present), well pumping to <br />supply irrigated lands should be estimated by the consumptive use algorithm in StateCU and <br />StateMod, to meet the irrigation water requirement less simulated surface water deliveries (if <br />applicable). Lagged well depletions affect river flows based on timing and location factors <br />defined in StateMod input files. Lagged depletions and the supplies used to meet those <br />obligations should be accounted in one Fort Morgan Canal Well Depletions Plan structure (ID <br />0102528) below the ditch corresponding with administration of the augmentation plan. <br />Augmentation Plan Supplies <br />Various sources are typically available to supply water to replace lagged well depletions. The <br />sources and the structures related to the Fort Morgan augmentation plan recommended for <br />inclusion in the SPDSS model are summarized in Table 2. Augmentation supplies are as <br />follows: <br />• Recharge rights from the river for the Fort Morgan Canal augmentation plan are <br />summarized in Table 3. <br />• Recharge well rights and augmentation well rights are summarized in Table 4. <br />Model operations to supply well depletions (stored under plan ID 0102528) are discussed in the <br />augmentation plan operations section. <br />A-55 ofA-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.