My WebLink
|
Help
|
About
|
Sign Out
Search
VMP Final Report 4-30-08
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
VMP Final Report 4-30-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:25 AM
Creation date
5/14/2008 10:44:26 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Jefferson
Stream Name
South Platte River
Basin
South Platte
Title
South Platte River Chatfield Downstream Channel Improvement Vegetation Management Plan
Date
4/30/2008
Prepared For
CWCB Watershed Protection & Flood Mitigation Section
Prepared By
Lifezone Ecological, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />South Platte River, Chatfield Downstream Channel Improvement Project- Vegetation Management Plan <br /> <br />The larger reach was separated to ensure that the entire project area included mitigation <br />projects for a diverse habitat mosaic and to assist with monitoring. The reaches include. <br /> <br />Reach A) South Platte Park - Bowles Avenue <br />Reach B) Bowles Avenue - West Union Avenue (Pilot Project) <br />Reach C) West Union Avenue - West Oxford Avenue <br />Reach D) West Oxford Avenue - Hampden Avenue <br /> <br />Public Involvement <br />In addition to coordination with agencies and stakeholders, an extensive public education and <br />outreach component of this VMP is vitally important. Public perception and input regarding <br />the high value of the environment, in terms of environmental and aesthetic benefits needs to <br />be taken into account as the South Platte corridor includes one of the most highly utilized <br />trail systems in the state and is enjoyed by thousands of outdoor enthusiasts. The draft VMP <br />plan will be summarized in a press release and posted for public review and comment. In <br />addition, public meetings will be conducted prior to implementation of the proposed plan to <br />provide detailed information to interested parties and to gain public input and facilitate <br />collaboration on mitigation opportunities and potential assistance with seeding and planting <br />of acceptable vegetation near the project to maintain habitat connectivity and value. <br /> <br /> <br />Page 7 <br />Final Report - April 30, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.