My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07357
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:55 PM
Creation date
10/12/2006 2:16:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.300
Description
Platte River Basin - Basin Multistate Organizations - Missouri Basin States Association
State
CO
Basin
South Platte
Water Division
1
Date
1/29/1962
Author
Unknown
Title
Proposal for Firming the Federal Hydroelectric Plants Serving Preference Customers in the Eastern Division - Missouri River Basin Project - Report and Summary
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />;~' <br /> <br />I <br />:~ <br />:f~ <br />,~ <br />ti <br /> <br />';~ <br />:~~ <br />:*~ <br />',~~ <br />'" <br />>.'~ <br />:,.-, <br />,::j <br />, <br />'" <br />'.1: <br /> <br />) <br />" <br />:.:~~ <br /> <br />') <br />"~~ <br /> <br />:::~ <br />::1 <br />','i <br /> <br />l" <br /> <br />. <br /> <br />~irgi; <br /> <br />(~~::, <br /> <br />O " " <) (. I. <br />t) N i..:. ~; '-~ <br /> <br />January 29, 1962 <br /> <br />The Honorable Stewart L. Udall <br />Secretary of the Interior <br />Washington 25, D. C. <br /> <br />5v......."'<2...'1' A~o-1\CD <br /> <br />~ &>c, U'-- .oJl IS"' '"10.,.. L <br />l'A.....c;. <br /> <br />Dear Mr. Udall: <br /> <br />Proposal for Firming the Federal <br />Hydroelectric Plants Serving Preference Customers <br />in the Eastern Division-Missouri River Basin Project <br /> <br />The parties making this Proposal, namely those whose names are subscribed <br /> <br />hereto, are hereinafter for convenience called the Firming Thermal Systems. <br /> <br />Factual Understanding <br /> <br />This Proposal relates to eight hydroelectric generating plants of the <br /> <br />United States on the Upper Missour1., River and its tributaries known as Fort <br /> <br />Peck, Garrison, Oalle, Big Bend, Fort Randall, Gavins 'Point, Canyon Ferry, <br /> <br />and Yellow Tail. <br /> <br />According to available data, the aggregate name plate rating of the <br /> <br />hydroelectric generating plants, upon completion, will be as follows: Fort <br /> <br />Peck'~ 165,000 kw, Garrison - 400,000 kw, Oahe - 595,000 kw, Big.Bend <br />468,000kw, Fort Randall - 320,000 kw, Gavins Point - 100;000 kw, Canyon <br />Ferry - 50,000 kW, and Yellow Tail - 200,000 kw. <br /> <br />Available data supplied by the United States Corps of Eng:lneers and <br /> <br />Bureau of Reclamation indicate that, upon completion, the eight generating <br /> <br />plants will have an aggregate firm peaking capability of 1,850,000 kw assigned <br /> <br /> <br />to the Eastern Division-Missouri Basin Project for supplying the requirements <br /> <br />of Preference Customers of the United States, but because of the possibilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.